Showing posts with label set up. Show all posts
Showing posts with label set up. Show all posts

Wednesday, October 21, 2026

Burn2: "The Man" Is Up

 

It took a little time, but "The Man" for this year's Burn2 art and music festival is up. I went by yesterday evening, and it was no longer in pieces on the ground, but it and it's base were built and upright.

I had a few words with Zoren Manray, the primary builder of "The Man." He told me because of real-life he had been delayed in construction, but had it "mostly up" by Tuesday night. Like other years, this one is based on it's counterpart at the real-life Burning Man, "every year an approximation of the real-life Man is made." But there are small differences, "the RL one had more trusses instead of solid parts and more artwork inside. Overall the shape and design is the same though. This year the design was interesting since the base was quite tall. Usually there is only one deck, but this has three. This also meant that in RL they had to limit the number of people on it to 40 or so.. to keep it from being overloaded."


"Also since they had to make the base so strong it lead to an interesting burn. It just did not want to collapse." Zoren did say they would at least try to make the burn last a little longer. 
 
At night, neon tubes inside The Man make it more visible. And like what could be done with the real one, one can climb up it. Zoren did say there were a last few touches on it.
 
The "Burning of The Man" will take place on Saturday October 24. 

Bixyl Shuftan